I was at the 15-2 status for 7 weeks. But the plant vacation shut down was in the middle of this period so I would not take this as a normal timeline.
 

·
Registered User
Joined
·
2 Posts
Just checking to see if others that ordered in March this year an AWD Pro S gradient package and was locked on June 21st. My status changed to 15-1 in early Sept and is still sitting at that level since the first week in Sept. Based on many posts those folks that ordered in Q4 of 2020 are now getting their cars. My assumption is that my car will be here in mid to late November based on production levels. Anyone else who ordered in March seen their status change to 15-2 yet?
I ordered in Minnesota too, so I thought I'd reach out to a fellow MN waiting for their car!
My status went to 15-2 a few weeks ago... no movement since.
Ordered September 2020
Locked March 5, 2021
 

·
Registered User
AWD Pro S, Dusk Blue - Locked 8/26/21, Estimated delivery Nov-Dec
Joined
·
31 Posts
I ordered a AWD Pro S (non-Gradient), locked in July (Nov-Dec delivery). Since AWD production started recently I've been checking my order every day. This morning my orderStatusCode went from 03 to 10. I understand that the '15's are in production. Is moving from '03' to '10' meaningful in some way?
I was looking into changing my delivery dealer. In the process I found out that status 03 is locked, but that the reservation hasn't been entered into the factory's system. Status 10 still means locked, but the reservation order has been incorporated into the factory's system. As a result of being at "10" I cannot change my dealership. I guess this is a good sign. You and I are on the exact same timeline with any estimated delivery of Nov 1 to Dec 1.
 

·
Registered User
Joined
·
17 Posts
I ordered in Minnesota too, so I thought I'd reach out to a fellow MN waiting for their car!
My status went to 15-2 a few weeks ago... no movement since.
Ordered September 2020
Locked March 5, 2021
Hi Pipp

I ordered from Burnsville VW and wondered what dealer you are using. Glad to hear that you are at 15-2 and that means you should have your car before the end of the year. I think I will get mine as well but it might not be until mid to late December given what I have seen on the site. Do you have a production date yet? Also what did you order?
 

·
Registered User
Joined
·
17 Posts
My estimated delivery date changed today to November/December. It was Sept/Oct. I am at 15-1 and have been there since first week in Sept. I hope I get the car this year to say the least.
 

·
Registered User
Joined
·
360 Posts
My estimated delivery date changed today to November/December. It was Sept/Oct. I am at 15-1 and have been there since first week in Sept. I hope I get the car this year to say the least.
Mine went from Nov/Dec to Dec/Jan.
 

·
Registered User
AWD Pro S, Dusk Blue - Locked 8/26/21, Estimated delivery Nov-Dec
Joined
·
31 Posts
Something must have been updated/changed this morning. I too moved from Nov 1 - Dec 1 to Dec 1 - Jan 1. Maybe there is a silver lining in that someone is being more realistic in delivery times.
 

·
Registered User
Joined
·
48 Posts
My status went to 15-2 a few weeks ago... no movement since.
Ordered September 2020
Locked March 5, 2021
I am in Wisconsin and I reserved an Awd Id.4 Pro S (non gradient) on 10/1/20, locked 3/5/21, status 15-2 on 9/29/21, and status 20-1 on 10/7/21.
It was about a week for production.
 

·
Registered User
Joined
·
224 Posts
I am in Wisconsin and I reserved an Awd Id.4 Pro S (non gradient) on 10/1/20, locked 3/5/21, status 15-2 on 9/29/21, and status 20-1 on 10/7/21.
It was about a week for production.
Mine changed as well to 20-1 over the past 24 hours. They will be ship buddies and maybe even unloaded at the same harbour (Pittsburgh, PA here).
 

·
Registered User
Joined
·
48 Posts
Mine changed as well to 20-1 over the past 24 hours. They will be ship buddies and maybe even unloaded at the same harbour (Pittsburgh, PA here).
I think for a delivery to Wisconsin, it is shipped to Houston, but we will probably be ship buddies for a part of the voyage. Your car should get to the dealer ahead of mine.
 

·
Registered User
Joined
·
224 Posts
I think for a delivery to Wisconsin, it is shipped to Houston, but we will probably be ship buddies for a part of the voyage. Your car should get to the dealer ahead of mine.
My dealer just wrote in an email that the estimated delivery here is 11/26-12/11. So, 7-9 weeks after reaching status code 20-1.
 

·
Registered User
Joined
·
48 Posts
My dealer just wrote in an email that the estimated delivery here is 11/26-12/11. So, 7-9 weeks after reaching status code 20-1.
That's about what I figured for my car. I would think if they get on a ship soon, yours would come sooner, hopefully before it starts snowing!
I did get my email from VW today(10/9), that it's left the factory and is on the water, but status is still 20-1.
 

·
Registered User
Joined
·
224 Posts
That's about what I figured for my car. I would think if they get on a ship soon, yours would come sooner, hopefully before it starts snowing!
I did get my email from VW today(10/9), that it's left the factory and is on the water, but status is still 20-1.
Exactly same here. Need to change the thread and track the boat. 😉
 

·
Registered User
Joined
·
2 Posts
Hi Pipp

I ordered from Burnsville VW and wondered what dealer you are using. Glad to hear that you are at 15-2 and that means you should have your car before the end of the year. I think I will get mine as well but it might not be until mid to late December given what I have seen on the site. Do you have a production date yet? Also what did you order?
I ordered from Burnsville as well... sort of. :) I first ordered from Inver Grove Heights, but have moved since and switched over to Burnsville. It did not change my place in line though.
Over the weekend, I moved to 20-2!!!! It says it's on a ship! I think.
WaHOO!
 

·
Registered User
Joined
·
17 Posts
I ordered from Burnsville as well... sort of. :) I first ordered from Inver Grove Heights, but have moved since and switched over to Burnsville. It did not change my place in line though.
Over the weekend, I moved to 20-2!!!! It says it's on a ship! I think.
WaHOO!
That is great news that you went to 20-2 and I am still at 15-1 now for the last month. Yeap 20-2 means you are in transit and Aaron the EV specialist at Burnsville VW should be able to give you now an estimated delivery date on your car. You should also now have a VIN number that you can get off the site. I would estimate that you should have your car by mid to late November but check with Aaron at Burnsville to get a firmer date.
 

·
Registered User
Joined
·
48 Posts
Over the weekend, I moved to 20-2!!!! It says it's on a ship! I think.
WaHOO!
I think they are loading the cars first that they will unload last. Your in Minnesota and I am in Wisconsin, so I think they will unload in Houston and then move the cars overland to our dealers. Hopefully, we will get them at the end of November or beginning of December.
 

·
Registered User
Pro S w/Gradient AWD
Joined
·
94 Posts
Discussion Starter · #199 ·
Just checking to see if others that ordered in March this year an AWD Pro S gradient package and was locked on June 21st. My status changed to 15-1 in early Sept and is still sitting at that level since the first week in Sept. Based on many posts those folks that ordered in Q4 of 2020 are now getting their cars. My assumption is that my car will be here in mid to late November based on production levels. Anyone else who ordered in March seen their status change to 15-2 yet?
It appears we are in the same boat. Locked my order on 21 June and moved to 15-1 on 11 Sept, and here we are a month later and no change. Other than the delivery date changing to Nov-Dec now.
 

·
Registered User
Joined
·
17 Posts
It appears we are in the same boat. Locked my order on 21 June and moved to 15-1 on 11 Sept, and here we are a month later and no change. Other than the delivery date changing to Nov-Dec now.
I am now thinking that we might get our cars in January now. If we don’t move to 15-2 in the next week I don’t see how we get the cars by the end of December. Our cars will be 2021 models but I don’t see any other out come given the shipping times of 7 to 9 weeks after leaving the plant. What do you think.
 