US production in Tennessee isn't supposed to start up until 2022, but it sounds like it will just be the upcoming smaller battery pack being built there? Or will the 82kWh battery model be built in the US after 2022 as well?
 

·
Registered User
Joined
·
2 Posts
US production in Tennessee isn't supposed to start up until 2022, but it sounds like it will just be the upcoming smaller battery pack being built there? Or will the 82kWh battery model be built in the US after 2022 as well?
I also saw where one of the offerings was a lower base price option from Chattanooga plant due to the smaller battery pack, however did not indicate if the larger pack would not still be an option. Given the investments being made in Chattanooga for battery testing and nearby battery manufacturing, Chattanooga will be a major production facility and I tend to think both batteries would be available.
 